Run of River Hydro - Tla-o-qui-aht First Nation

Winchie Creek, BC

Project Description:

Winchie Creek Hydro is a run of river project with the Tla-o-qui-aht First Nation. 3D was involved with the rock topographic survey, the powerhouse floor survey, the penstock excavation volumes, and intake and powerhouse as-builts.

Previous
Previous

Terminal Ave - Nanaimo

Next
Next

AAA Cycling Infrastructure